The operation procedure of the water well drilling rig is generally as follows:
Check whether the parts of the drilling rig are normal, and prepare the required tools and materials.
Install the drilling rig in a suitable position and fix it.
Set drilling parameters, such as drilling speed, drilling pressure, etc., according to geological conditions and well depth requirements.
Start the drilling rig and start drilling, meanwhile pay attention to observe the running status of the drilling rig and the drilling situation.
If encountering abnormal conditions such as jammed drill, collapsed hole, etc., take appropriate measures to deal with them in time.
When the drilling reaches the predetermined depth, carry out final hole inspection to ensure that the quality of the borehole meets the requirements.
After completing drilling, subsequent operations such as well washing and tubing lowering can be carried out.