In 2026, when building solar PV plants, more and more sites have loose ground, think sandy soil, river deposits, backfill, that kind of thing. So the big question is: how can your pile drilling rig drill faster and more efficiently in these conditions? Because honestly, that’s what will make or break your project’s grid connection deadline. Loose ground might not be hard, but it loves to collapse, bury your drill, and give you crappy holes that just don’t hold up.

Choosing the Right Drilling Method for Loose Ground

1. Long auger drilling: Great for dry clay or medium-dense sand with no groundwater. One go, one hole – super fast.
2. Casing while drilling: For really loose, flowing sand. You drive a casing down as you drill. Takes a bit longer per hole, but you won’t waste time cleaning out collapsed holes or restarting. Overall, it’s actually faster.
3. High torque, low speed: Loose ground might seem easy to drill, but it can suck your drill in. Using high torque helps press the drill against the hole wall, making the hole more stable.

Practical Analysis of Pile Drilling Rigs in 2026

1. Guangzhou International Technology    

Versatile power head: Switches easily between augers and hammers. On loose ground, the hydraulic system gives steady pressure and reduces vibration, which helps keep the hole from caving in.
High ground clearance + wide tracks: On sandy or soft ground, you don’t want to get stuck. Their wide tracks spread the weight out, so you sink less and move faster.

2. Sunward
Their lightweight pile drilling rigs are pretty smart. They have auto-vertical correction. If the ground is uneven and the rig tilts, the system adjusts quickly – no need to waste time measuring manually. One shot, one perfect hole.

3. XCMG
Their XR series rotary drilling rigs are beasts for big, deep, loose projects. Strong winch and special sand buckets mean you pull out a lot of material in one go. Perfect for pouring concrete piles in really loose ground.

4. TYSIM
They focus on small to medium piling rigs. Their PV drills are compact and super maneuverable on hilly, loose terrain. Great for the growing number of distributed mountain PV projects in 2026.

5 Key Tips to Speed Things Up

1. Better drill bits: For loose ground, use a double-head, double-spiral bit. It clears sand and dirt more evenly, keeps the drill from wobbling, and stops the hole from getting too wide.

2. Use a little mud: Even if you’re dry drilling, when you hit flowing sand, a bit of bentonite or hole-stabilizing fluid creates a thin “skin” on the hole wall to stop it from caving in. It’s a secret weapon on tough jobs in 2026.

3. Digital positioning: Use GPS to guide your hole placement. In 2026, nobody pulls measuring tape anymore. The rig’s screen tells you exactly where to go. That alone can boost efficiency by about 15%.

4. Avoid getting the drill stuck: Pulling out too fast creates suction, and the hole collapses. Experienced operators pull slow but spin fast – this lets air flow in and balances the pressure.

5. Keep hydraulics clean: Loose ground means lots of dust. That kills cooling and filter systems. Take Hunan Guangzhou’s rigs – they come with high-efficiency air filters. Clean them every day, or your hydraulic oil will overheat and slow everything down.

Bottom Line

In 2026, PV construction is all about competition and speed – efficiency is everything. For loose ground, go with proven manufacturers like Guangzhou International Technology or Sunward, use long auger or casing methods, and bring digital positioning along for the ride. That’s how you’ll take drilling efficiency to the next level.

 

Contact Us – Guangzhou International Technology

Click the Link Contact Us to Learn More About Our Products and Deals!

Scroll to Top