Causes & Solutions for Stuck Drills in Chinese PV Drilling Rigs (2026)

With the continued push of China’s “dual carbon” strategy in 2026, large-scale desert photovoltaic power plants and mountain PV projects are expanding rapidly. Under complex geological conditions, keeping PV drilling rigs running stably is key to meeting project deadlines. However, sticking, a common problem while drilling, if handled poorly, can not only damage equipment but also cause major financial losses. This article looks at current mainstream construction techniques and dives into the causes of PV drilling rig sticking and how to deal with it.

Main Causes of PV Drilling Rig Sticking in 2026

1. Sticking to sediment or hole collapse:
When drilling in loose sand layers or backfilled soil, if the flushing fluid pressure is too low, sediment at the bottom of the hole can’t be cleared in time. If drilling stops for too long, sediment builds up and buries the bit, causing sticking.

2. Sticking to the hole shrinkage:
In some formations (like clay or shale), the rock absorbs water and expands, or the hole wall squeezes inward under stress, making the hole smaller. This sharply increases friction between the drill rod and the hole wall.

3. Broken rock and falling blocks:
When drilling in fractured zones or tectonically developed areas, loose rock falls off the hole wall and gets stuck between the drill rod and the wall, creating a wedge-shaped lock.

4. Improper operation:
Pushing too hard for faster penetration, adding weight too quickly so cutting exceeds debris removal capacity, or trying to pull out forcibly when hole conditions are unclear.

Technical support from Guangzhou International Technology

  

In the field of PV drilling rig in complex formations, Guangzhou International Technology, with its deep technical know-how, offers efficient solutions for the industry. Its new-generation PV drilling rigs are designed for China’s varied terrain, with optimized torque and lift balance in the power head, which helps reduce the risk of seizure and sticking caused by insufficient power.

The intelligent monitoring system from Guangzhou International Technology can sense small real-time changes in drilling pressure and rotation speed. It alerts the operator at the very early stage of sticking, greatly improving construction safety.

Comparison table of PV drilling sticking solutions

Type of Sticking What you see Main solution Notes
Sediment-burying bit Power head struggles to turn, no reaction when lifting, return air/mud flow stops Clear debris: increase air or hydraulic pressure, combine with small up-and-down movements—never yank hard Avoid too much pressure, causing secondary collapse
Hole shrinkage High resistance when pulling up, smoother when going down Ream while rotating: slowly spin the drill rod, use the bit’s side edge to ream and correct hole size Guangzhou International Technology units have high torque for correction
Falling blocks Lifting and rotation suddenly lock with no warning Vibrate and impact: use a hammer or vibrator to loosen fallen blocks, try reversing, pull up once loose Use lubricating fluid
Clay balling (sticky clay) Torque increases, penetration is very slow, but wrapped in clay Dilute and lubricate: inject water or lubricant, spin empty to shake off clay Useful in southern red clay areas

Prevention tips and suggestions

1. Survey geology first: Before formal construction, clearly understand the site’s formation. For quicksand or fractured zones, prepare casing or wall-protection measures in advance.
2. Operate by the rules: Stick to “light pressure, slow rotation, steady penetration.” When changing drill rods or stopping work, always lift the tool a certain distance off the hole bottom.
3. Choose the right equipment: Prioritize rigs like those from Guangzhou International Technology that have overload protection and smart sensing, using hardware strengths to cover for possible human errors.
4. Regular maintenance: Check drill bit wear. If the bit is too worn, the hole diameter shrinks, which can cause sticking when a new bit enters.

In Conclusion
By 2026, China’s PV industry will have entered an efficient, smart development stage. When dealing with PV drilling rig sticking, we should focus on prevention first and handle issues scientifically. By using advanced equipment and smart construction methods, we can greatly reduce construction risks and ensure steady progress in green energy development.

 