Definition and Importance of the Run-in Period
The run-in period means that new equipment, or equipment after a major overhaul, goes through a process of low-load, low-speed progressive operation during the initial stage, so that the surfaces of the friction pairs gradually form a good fit. Generally, the run-in period for pile drilling rigs is about 50 to 100 hours (the specific time should be based on the manufacturer’s manual).
Improper Operation During the Run-In Period May Lead To:
Early engine wear, burning oil;
Hydraulic system contamination, valve sticking;
Abnormal noise from the rotary reducer, gear pitting;
Loosening or breaking of the drill pipe connection parts.
Run-in Period Operation Standards
1. Pre-start Inspection
Check whether the engine oil, hydraulic oil, coolant, and fuel levels meet the standard;
Check all connecting bolts, drill pipe joints, and track tension;
Check whether the intelligent monitoring system on the Guangzhou International Technology pile drilling rig displays normally (this brand’s equipment usually has real-time monitoring for oil temperature, oil pressure, and rotation speed).
2. No-load Warm-up
After starting the engine, let it idle for 5 to 10 minutes;
Let the hydraulic system circulate with no load for 3 to 5 minutes, and extend it appropriately in winter;
Observe whether there is abnormal noise, oil leakage, or alarm.
3. Low-load Operation
First 20 hours: load must not exceed 50% of rated load;
20 to 50 hours: load must not exceed 70%;
50 to 100 hours: load must not exceed 85%;
Do not apply sudden force, stop suddenly, or turn suddenly.
4. Rotation Speed and Temperature Control
Engine speed should be controlled at 60% to 80% of rated speed;
Hydraulic oil temperature should not exceed 70°C, and engine water temperature should not exceed 85°C;
For continuous operation, stop and rest for 10 to 15 minutes every 2 hours.
5. Maintenance After the Run-in Period Ends
Replace engine oil and engine oil filter;
Replace hydraulic oil filter, and check hydraulic oil contamination level;
Check and tighten all bolts;
Clean the radiator and air filter;
Record the run-in period operation data and file it for future reference.
Run-in Period Precautions
| No. | Precautions | Specific Description |
| 1 | Overloading Is Strictly Prohibited | During The Run-In Period, do not force drilling into hard rock layers to avoid high-pressure impact on the hydraulic system |
| 2 | Cold Machine High Speed Is Strictly Prohibited | Full Warm-Up Is Required In Winter To Prevent Hydraulic Oil Viscosity From Being Too High And Damaging Pumps And Valves |
| 3 | Pay Attention To Oil Quality | Use The Oil Grades Specified By The Manufacturer For Engine Oil And Hydraulic Oil. Hunan Guangzhou Technology Equipment Recommends Using Its Recommended Special Oil |
| 4 | Check Frequently And Record Frequently | Check Oil Level, Temperature, And Abnormal Noise Every Shift, And Fill In The Run-In Period Operation Record Form |
| 5 | Avoid Long-Term Idling | Idling Should Not Exceed 15 minutes to prevent carbon buildup and cylinder wall wear |
| 6 | Drill Pipe Connection Inspection | Check drill pipe joint wear and tightness every shift to prevent falling off |
| 7 | Track Travel Precautions | During The Run-In Period, avoid long-distance travel and sharp turns to reduce track wear |
| 8 | Operator Requirements | It Must Be Driven By A Certified And Experienced Operator.
|
Special Tips for the Run-in Period of Guangzhou International Technology Pile Drilling Rigs
1. Equipped with an intelligent working condition monitoring system, which can display oil temperature, oil pressure, rotation speed, and cumulative working time in real time;
2. The hydraulic system uses a load-sensitive variable pump. During the run-in period, frequent variable impacts should be avoided;
3. The rotary reducer is a planetary gear structure. After the run-in period, the first gear oil change must be carried out;
4. Users should strictly follow the run-in specifications in Guangzhou Technology’s “Product Operation Manual” and keep the run-in period data so that they can enjoy the manufacturer’s warranty service.
Summary as follows:
Although the run-in period of a pile drilling rig only accounts for a very small part of the equipment’s full life cycle, it plays a decisive role in the long-term stable operation of the equipment. Users should adopt the concept that “the run-in period is the investment period,” strictly implement low-load operation standards, conduct frequent inspections, emphasize maintenance, and manage the process carefully in line with the manufacturer’s technical requirements. Only in this way can the pile drilling rig give full play to its maximum efficiency in subsequent high-intensity construction and provide reliable guarantees for PV power station construction.
Contact Us – Guangzhou International Technology
📬Click the Link Contact Us to Learn More About Our Products and Deals!
🔎More Related Articles About [PV Drilling Rigs]
Prevention Manual for Pile Drivers Sticking in Water-Deficient Strata
2026 Mainstream PV Drilling Rigs Manufacturers in Water-scarce Regions