1.1 Water bubbling up from the casing

The main role of the barrel is to prevent the hole wall from collapsing, laying the foundation for the success of drilling. In addition, it also isolates surface water, protects the ground at the mouth of the hole, fixes the position of the pile hole, and guides the drill bit.

Firstly, Select a strong and durable shoring.

Secondly, the shroud should be buried at the appropriate depth, the surrounding soil should be compacted in layers, and the soil quality should be generally selected from clay with appropriate water content.

Thirdly, when the drill bit rises and falls, it is easy to collide with the casing, resulting in water leakage. Therefore, when drilling, the drill bit needs to be vertical and press the barrel.

Fourthly, when the drilling meets the stratum with strong permeability or groundwater flow, it is also easy to lead to water bubbling out of the casing. In this case, you can increase the buried depth of the casing, increase the specific gravity of the mud, pour clay with slow rotation, with the impact method of drilling, but also fill with schist, crushed pebbles soil, and repeated impact to enhance the retaining wall.

1.2 Hole collapse, buried drilling

water well drilling rig

Drilling is a key process, and collapsing and burying are the most likely accidents. Generally in the process of drilling, if you find that bubbles keep appearing in the discharged mud, or the mud suddenly leaks, it means that there is a sign of hole wall collapse. To deal with the problems of hole wall collapse and buried drilling, pay attention to the following points:

First, do a good job of mud preparation.

Secondly, loose soil, failure to fill tightly with clay around the shroud, and low water level in the shroud as well as too fast drilling speed, too long empty drilling time, too long waiting time for filling after hole formation and too long filling time will cause hole wall collapse. Therefore, in the loose and collapsible soil layer, we should bury the casing appropriately deep, fill the surrounding area of the casing with clay densely, use high-quality mud, improve the specific gravity and viscosity of the mud, and keep the mud water level in the casing higher than the groundwater level.

Thirdly, when encountering small cavities or cracks, the phenomenon of uniform and slow decline of mud in the hole may occur. At this time, it can work to add the appropriate amount of cement in the mud to increase the specific gravity of the mud and its wall protection effect.

1.3 Necking of water well drilling rig

water well drilling rig

Necking, i.e. the hole is smaller than the designed diameter, is the most common quality problem of bored piles. To solve the necking problem, we need to find the correct treatment method for the reason of necking.

Firstly, the main reason for necking is due to the expansion of the soil around the pile in the process of pile casting. To deal with this situation, high-quality mud work to reduce the amount of water loss.

Secondly, necking is also prone to occur when groundwater and the vibration of surrounding vehicles affect the soft soil layer.

Thirdly, for the necking caused by the wear of the drilling hammer, the hammer should be welded in time, or a certain number of alloy blades should in its outer side.

1.4 Hole formation skew of water well drilling rig

water well drilling rig

Hole skewing refers to the large vertical deviation or bending of the pile hole of the borehole wall. Its causes and treatment methods are mainly:

First, the ground at the construction site is soft or unevenly soft and hard, and when drilling on the support, the bearing capacity of the support is insufficient, and uneven settlement occurs, resulting in the drilling rod not being vertical.

Secondly, the failure to do a good job of rig installation is a hidden danger that causes skewed holes. When the drilling rig is in place, it should make the turntable, and the base horizontal, make the rim of the overhead wheel, the chuck of the drill pipe, and the center of the shroud in the same vertical line, and prevent displacement during drilling, and when drilling in uneven strata, use a drilling rig with a large self-loading capacity and large rigidity of the drill pipe.

Thirdly, when encountering situations such as the soil layer is distributed diagonally or there are large isolated stones or other hard objects in the soil layer. In addition, installing the guide device is also a simple and effective way to prevent the hole from slanting.

1.5 Excessive amount of slag at the bottom of the pile

water well drilling rig

For friction piles, because their force mechanism is through the friction force or attachment force between the pile surface and surrounding soil, the load is gradually transferred from the top of the pile to the surrounding soil.

If the end reaction force is not big in the design, the amount of slagging at the end also has little effect on the pile-bearing capacity;

For bearing piles, if the amount of slagging is too small, it is inevitable to cause a large amount of settlement when loading and the same will make the pile failure of the bearing capacity. The causes and treatment methods are as follows:

Firstly, the inspection is not serious enough, and the unclean clearing of the hole or the failure of secondary clearing is the primary cause of the excessive amount of slag at the bottom of the pile.

Secondly, in the process of lifting and placing the reinforcement cage, the collision with the hole wall without aligning the hole position makes the soil slump to the bottom of the pile, resulting in slagging at the bottom of the pile. Therefore, when lifting and placing the reinforcement cage, keep the center of the cage in line with the center of the pile and avoid collision with the hole wall.