The operation procedure of the water well drilling rig is generally as follows:

1. Preparation:

Check whether the parts of the drilling rig are normal, and prepare the required tools and materials.

2. Installation of drilling rig:

Install the drilling rig in a suitable position and fix it.

3. drilling setup:

Set drilling parameters, such as drilling speed, drilling pressure, etc., according to geological conditions and well depth requirements.

4. drilling process:

Start the drilling rig and start drilling, meanwhile, pay attention to observe the running status of the drilling rig and the drilling situation.

5. Handling abnormality:

If encountering abnormal conditions such as jammed drill, collapsed hole, etc., take appropriate measures to deal with them in time.

6. Final hole inspection:

When the drilling reaches the predetermined depth, carry out the final hole inspection to ensure that the quality of the borehole meets the requirements.

7. Follow-up treatment:

After completing drilling, subsequent operations such as well washing and tubing lowering can be carried out.