Industry news

How does a water well drilling rig work?

The working process of a water well drilling rig usually includes the following steps:

1. Rig positioning:

Place the drilling rig in the predetermined drilling location.

2. Connecting the power source:

Provide power to the drilling rig through an engine or an electric motor.

3. Installation of drill pipe:

Attach the drill pipe to the drilling rig.

4. Start the drilling rig:

Starts the drill to rotate.

5. Apply drilling pressure:

Push the drill bit into the ground.

6. Circulate mud:

Uses a mud circulation system to carry the rock and soil cut by the drill bit out of the borehole.

7. Monitor drilling parameters:

Such as drilling speed, torque, etc.

8. Replacement of drill bits:

According to the geological conditions and drilling needs, replace the appropriate drill bit at the right time.

9. Stabilize the well wall:

Take measures to prevent the well wall from collapsing.

10. Reaching the target depth:

Stop drilling when the target depth is reached.

In practice, the drilling rig operator needs to reasonably adjust the drilling parameters according to the geological conditions and engineering requirements to ensure safe and efficient completion of the drilling task.

CONTACT US

Contact: Mr. Jackson Chen

Phone: +86 18574606855

E-mail: md@guangzhouintl.com

Add: Shanhuxi Road Chuangfacheng Plaza Yongzhou City Hunan Province China, Yongzhou, Hunan, China