The working process of a water well drilling rig usually includes the following steps:
Place the drilling rig in the predetermined drilling location.
Provide power to the drilling rig through an engine or an electric motor.
Attach the drill pipe to the drilling rig.
Starts the drill to rotate.
Push the drill bit into the ground.
Uses a mud circulation system to carry the rock and soil cut by the drill bit out of the borehole.
Such as drilling speed, torque, etc.
According to the geological conditions and drilling needs, replace the appropriate drill bit at the right time.
Take measures to prevent the well wall from collapsing.
Stop drilling when the target depth is reached.
In practice, the drilling rig operator needs to reasonably adjust the drilling parameters according to the geological conditions and engineering requirements to ensure safe and efficient completion of the drilling task.
Contact: Mr. Jackson Chen
Phone: +86 18574606855
E-mail: md@guangzhouintl.com
Add: Shanhuxi Road Chuangfacheng Plaza Yongzhou City Hunan Province China, Yongzhou, Hunan, China